About the difficulties reported in the morning, the General Directorate for National Roads and Motorways in Warsaw. In connection with the accident of the drainage system there was restriction in movement within a node tidebuy design amazing back within S79 of the road. Currently, there is a control panel entry from the street Cybernetics in the direction of the street Navigation, and control Board. Sasanki (Zwirki and Wigury) on the S79 in the direction of the Airport. Continue work associated wypompowaniu water to restore the road to the Center, according to the website of GDDKiA.
As it turned out, this situation lasted for several hours. – We received notice around midnight. We started the action of pumping water from the roadway. We finished about 6 o’clock in the morning, said Onetowi Peter mother goose with the Metropolitan fire service.
however, This does not mean the end of the tube. Still the action of pumping water lead the team of GDDKiA. – It is not known exactly what the direct cause of the accident, and why the drains can’t take all the water. Cause of interference can be works made for building Seaworthy. Determination of the causes of complications after the completion of work related to wypompowaniem water. At the moment it is difficult to estimate when this will happen, he tells us, in his turn, Gennady Tarnowska, press Secretary of the GDDKiA in Warsaw.
throughout the neighborhood in the morning formed a huge tube. Road builders suggest to avoid this place.
(DK)
No comments:
Post a Comment