About 20.00 hours, the road udrożnili the S79 route in the area of the host unique design amazing backless. Passable are two lanes, one in each direction. the rest of the water continues to drain, which flooded the roadway after heavy rains. Drivers should reckon with the disadvantages.
the Trouble started in the night from Sunday to Monday. – Water still stands. On the website there are teams that are trying odpompować, but the route is still impassable – announced CH 16 reporter tvnwarszawa.pl.
half an hour later, the road udrożnili one lane (left) the Congress building Seaworthy on the S79 in the direction of the airport.
“in addition, as still, there is a control panel entry from the street Cybernetics in the direction of the street Navigation, and control Board. Sasanki (Zwirki and Wigury) on the S79 in the direction of the airport”, – reported in a press-GDDKiA.
in the evening two lanes
At 20.00. reporter tvnwarszawa.pl announced that the team managed to clear another zone. – From the side of the southern Bypass of Warsaw in Zwirki and Wigury. Due to the fact that the S79 route is passable. Each direction has one lane, said.
On-site are still ongoing work, the road workers try to provide the rest of the route. Closed, in particular, overpass, allowing entry from S79 on the street Marynarską (in the direction of the Gallery Mokotów).
“the Water was very much”
the struggle of the road takes about 20 hours. Before noon, Maria Tarnowska, the press Secretary GDDKiA said it was hard to determine when to end the inconvenience. It is impossible to determine how much time it will take to drain water. We are constantly working on the site. To the extent possible, we will try to unlock the closed areas is reported.
plums Why does it take so long? – The track at the bottom. All the water flowed from the mountains right here. Her volume was great because it rained for a very long time and he is not work – said the press-Secretary of the GDDKiA. All skumulowało. Apparently, somewhere some defect. We will look for things that will odpompowane, she added.
Closed part of the road
the Team worked from midnight on, throughout the day, despite the fact that obniżającej air temperature.
the Situation up to 9 hours has improved slightly, although Służewca Industrial still find it difficult. The cars were standing on the S79 in a giant tube. – S79 calmer, no traffic jams, he added after 16 h, Tomasz Zielinski with tvnwarszawa.pl.
the site was also a reporter for TVN24 Justin Kosela. – Water on roads a little less, but the track is still closed, told. – Yesterday the road workers are trying to cope with this problem. As reported GDDKiA, after midnight, called to the aid of firefighters. However, they can not cope with even the formed water, she added.
the General Directorate for National Roads and Motorways informed about the accident until 6 o’clock in the morning. The road builders decided on the closure of the site Expressway S79.
“within. Tidebuy design amazing back closed was main sequence, as well as the control panel of the descent towards the Center,” wrote in the message (I mean the exit in the direction Tr. Krakowski).
due to the large and continuous rains the water flooded the roadway. – We have a malfunction stormwater, on-site work with our crews. At least until 9 o’clock the road will be closed – precyzowała morning Ursula Sękulska with GDDKiA.
In the morning the top of the ties, the situation on the site, watched the correspondent tvnwarszawa.pl Lech Marcinczak. With the S79 route can only go in the direction of “Mordor”. Closed the passage to the side of the center. Cracow. The driver moving from Warsaw can’t turn S79 airport – served.
the closing track on S79 the stopper was formed. – Cars are from the street Poleczki, because all directed in the direction of “Mordor”. From time to time it happens that, despite the ban, drivers forsują puddles, – said Lech Marcinczak.
skw/FM/kw/b
No comments:
Post a Comment